Source: Levelica
Canonical: https://www.levelica.com/en/guides/change-management

# 변화 관리 (Change Management)

## Summary

Designing and leading organizational change: assessing impact, converting resistance, and making it stick.

## Description

Change management addresses the human side of moving an organization from its current state to a target state. While project management handles technical execution, change management focuses on helping the people affected by that change adopt and sustain new ways of working. The journey starts with recognizing the need for change, progresses through impact assessment and strategy development, builds organization-wide change capability, and ultimately reaches the creation of new change management paradigms. The depth of analysis, breadth of stakeholder engagement, and quality of strategic judgment required shift qualitatively at each stage.

---

## Level Overview

| Level | Proficiency Stage     | Hashtags                                                                         |
| ----- | --------------------- | -------------------------------------------------------------------------------- |
| Lv.1  | Change Aware          | #ChangeAwareness #ChangeReactions #PersonalAdaptation                            |
| Lv.2  | Change Supporter      | #ADKAR #StakeholderCommunication #ResistanceRecognition #ReadinessCheck          |
| Lv.3  | Change Implementer    | #CMI-Foundation #ChangeStrategy #ImpactAssessment #CommunicationPlan             |
| Lv.4  | Change Strategist     | #ComplexTransformation #ResistanceConversion #ChangePortfolio #RiskMitigation    |
| Lv.5  | Change Architect      | #ChangeCapability #AgentNetwork #TransformationProgram #ACMP-Standard            |
| Lv.6  | Change Methodologist  | #ChangeFramework #ChangeConferences #ChangeMaturityModel #ExpertDevelopment      |
| Lv.7  | Change Paradigm Maker | #ChangeParadigmLimits #CrossIndustryAdoption #ChangeTheory #ChangeMovementLegacy |

> Proficiency stages were derived by cross-referencing the CMI Change Manager Accreditation three tiers (Foundation, Specialist, Master), the ACMP Standard's five process groups, and Kotter's (1995) eight-step change model. Each stage name reflects the primary role at that level.

> **Integrated Framework:** This guide's seven-level structure is not a mapping of any single change management model but rather the integration of five independent axes. The CMI Change Manager Accreditation provides the **competency certification axis** (from Foundation through Specialist to Master, an experience-based proficiency system for change management professionals). The ACMP Standard provides the **process axis** (from impact evaluation through strategy formulation, plan development, execution, to sustainment, representing systematic process maturity). The Prosci ADKAR Model provides the **individual change axis** (from Awareness through Desire, Knowledge, Ability, to Reinforcement, representing the adoption mechanism from the change recipient's perspective). The CMI CMBoK-based Competency Model provides the **professional competency axis** (from foundational knowledge through strategic judgment, organizational capability building, to industry-level contribution, representing deepening and broadening of competencies required of change management professionals). Kotter's (1995) eight-step model provides the **empirical-prescriptive axis** (a sequential execution model derived from analyzing transformation failures at over 100 companies, offering concrete behavioral prescriptions from establishing urgency through anchoring changes in culture). Each level boundary is determined at the intersection of these five axes.

> **Cross-Validation:** The references in this guide converge at three key level boundaries.
>
> - L2 to L3 boundary: CMI Foundation entry (beginning of independent execution), ACMP transition from Evaluate to Formulate (from impact assessment to strategy development), ADKAR transition from Knowledge to Ability (from acquiring knowledge to developing practical competency), independent application of Kotter's steps 1-4, and CMBoK transition from foundational to execution-level competencies
> - L4 to L5 boundary: CMI transition from Specialist toward Master (from managing multiple changes to building organizational change capability), ACMP transition from Develop/Execute to Sustain (from execution to designing sustainment systems), organizational-level application of Kotter's steps 5-8 (removing obstacles, generating short-term wins, consolidating gains, anchoring in culture), and ADKAR scope expansion from individual change to organizational change capability
> - L6 to L7 boundary: Transcending CMI Master (paradigm-level contributions that certification systems cannot capture), creating new methodologies that redefine the ACMP Standard, critically overcoming the assumptions of Kotter's model itself (linear stage progression), and generational contributions that exceed the scope of all reference frameworks

---

## Level 1

#ChangeAwareness #ChangeReactions #PersonalAdaptation

### Summary

Recognizing why change happens and adapting to it personally.

### Description

This is where you first enter the world of organizational change. You start by observing why change happens and what impact it has on work and people. You recognize your own reaction patterns and adapt to new processes or systems with an open mindset. You listen to the emotions and concerns colleagues express and identify change-related information to apply in your own work.

### Checklist

- [ ] Can explain the purpose and expected outcomes of ongoing change initiatives in your organization
- [ ] Can identify at least three ways a specific change affects your work processes, role, and required competencies
- [ ] Can recognize your own emotional reactions to change (anxiety, resistance, anticipation, etc.) and explain their causes
- [ ] Can adapt to a new process or system within the required timeframe by using available training materials
- [ ] Can listen to concerns colleagues express about change and accurately summarize their perspectives
- [ ] Can identify the key messages in official change communications (announcements, briefings, etc.) and apply them to your work

> Once you've achieved most of this checklist, you're ready to enter the Change Supporter stage, where you'll help colleagues around you adopt change. According to Prosci's ADKAR model (Hiatt, 2006), individuals must first develop Awareness and Desire before they can embrace change. As a concrete training method for the next stage, build the habit of diagnosing where you fall on the ADKAR five stages every time you receive a change announcement. Guiding colleagues through this same self-diagnosis is the core practice for making this transition.

---

## Level 2

#ADKAR #StakeholderCommunication #ResistanceRecognition #ReadinessCheck

### Summary

Using basic change models to support colleagues and gauge readiness.

### Description

You transition from accepting change to supporting it. You understand and apply basic change frameworks like the ADKAR model in practice. You identify stakeholders affected by change and evaluate each group's readiness level. You detect early signs of resistance to change and report them appropriately. You serve as a change champion within your team, delivering official messages to the front lines and collecting field feedback to relay to the change management team.

### Checklist

- [ ] Can explain the five ADKAR stages (Awareness, Desire, Knowledge, Ability, Reinforcement) and identify practical activities for each stage
- [ ] Can identify stakeholder groups affected by a change initiative and map each group's impact level and readiness
- [ ] Can conduct a change readiness assessment (surveys, interviews, etc.) with 10 or more team members and summarize the results
- [ ] Can identify early signs of resistance to change (work delays, informal complaints, reduced participation, etc.) and report them to the change management lead
- [ ] Can translate the organization's change messages into the context of team members' daily work for delivery
- [ ] Can systematically organize field feedback collected during the change process (concerns, obstacles, success stories) and report it upward

> Once you've achieved most of this checklist, you're ready to enter the Change Implementer stage, where you'll independently lead small-scale change initiatives. CMI Foundation-level competencies are required, and the key transition is expanding from the ACMP Standard's Evaluate process to the Formulate process. Try applying stages 1-4 of Kotter (1995)'s eight-step model (establishing urgency, building a coalition, developing a vision, communicating the vision) to real change cases. Even post-hoc analysis builds the framework application experience that underpins independent execution.

---

## Level 3

#CMI-Foundation #ChangeStrategy #ImpactAssessment #CommunicationPlan

### Summary

Owning small-scale change end to end and driving adoption.

### Description

You transition from supporting change to independently leading it. You own change initiatives end-to-end at the department or team level, assessing how change affects processes, roles, and skill requirements. You develop tailored communication plans per stakeholder group and design training that drives adoption. When you encounter resistance, you analyze root causes and develop solutions.

### Checklist

- [ ] Can independently conduct an impact assessment for a change initiative affecting 50 or more people and document the results
- [ ] Can write a change strategy document that defines the vision, objectives, scope, timeline, and success metrics for a change
- [ ] Can develop tailored communication plans (messages, channels, frequency, owners) for three or more stakeholder groups
- [ ] Can design and execute a training program for change adoption that achieves 70% or higher participant satisfaction
- [ ] Can diagnose root causes of change resistance (skill gaps, trust deficits, lack of understanding, etc.) and develop targeted responses
- [ ] Can track change progress using quantitative metrics (adoption rate, training completion rate, stakeholder satisfaction, etc.) and report results
- [ ] Can systematically compile lessons learned after completing a change initiative and apply them to subsequent initiatives

> Once you've achieved most of this checklist, you're ready to enter the Change Strategist stage, where you'll manage complex organizational changes simultaneously. According to the ACMP Standard, interactions between process groups increase exponentially when scope expands from a single change to multiple concurrent changes. Practicing Kotter (1995)'s emphasis on "coalition building" across multiple initiatives simultaneously is the starting point for portfolio management capability. Structuring the results of applying the eight-step model to completed change projects through After Action Reviews lets you extract repeatable patterns for the next change.

---

## Level 4

#ComplexTransformation #ResistanceConversion #ChangePortfolio #RiskMitigation

### Summary

Managing concurrent changes as a portfolio and converting resistance.

### Description

You operate where multiple concurrent changes intertwine, not just single initiatives. You manage change portfolios as a whole when interests conflict across departments and levels. You treat resistance not as an obstacle but as a signal to improve the change design. You engage senior leadership as change sponsors, assess organizational risk proactively, and develop mitigation plans. You monitor change fatigue and coordinate priorities across initiatives.

### Checklist

- [ ] Can manage three or more concurrent change initiatives as a portfolio and analyze their mutual impacts
- [ ] Can analyze resistance cases to identify improvement points in the change design and revise the strategy accordingly
- [ ] Can engage C-level or division-head-level leaders as change sponsors and clearly define their roles
- [ ] Can conduct a risk assessment for organizational change affecting 200 or more people and develop a mitigation plan
- [ ] Can periodically measure change fatigue levels and coordinate schedules across initiatives
- [ ] Can design transparent communication and fair processes for politically sensitive change situations (workforce redeployment, organizational restructuring, etc.)
- [ ] Can systematically extract lessons from change failure cases and apply them to improve the organization's change capability

> Once you've achieved most of this checklist, you're ready to enter the Change Architect stage, where you'll design organization-wide change capability. According to the CMI CMBoK, the essence of this boundary is the transition from managing individual changes to building the organization's own capability to absorb change. Kotter (1995)'s steps 7-8 (consolidating gains, anchoring in culture) describe organizational-level change internalization and correspond directly to the ACMP Standard's Sustain process. Practicing the application of your change management experience to other departments or programs is the core training for growing into an organizational capability designer.

---

## Level 5

#ChangeCapability #AgentNetwork #TransformationProgram #ACMP-Standard

### Summary

Building change agent networks to drive large-scale transformation.

### Description

You shift from managing individual changes to designing the organization's change capability. You oversee large-scale transformations (digital transformation, post-merger integration, business model pivots) affecting hundreds of people. You build a change agent network so change spreads organically at the front lines, embedding standard processes and capability development into operations.

### Checklist

- [ ] Can oversee a large-scale transformation program affecting 500 or more people and achieve stage-by-stage milestones
- [ ] Can select, train, and operate a network of 20 or more change agents within the organization
- [ ] Can diagnose the organization's change management maturity and develop a phased capability development roadmap
- [ ] Can introduce change management standard processes and tools across the entire organization and achieve 60% or higher utilization
- [ ] Can design a training program for change management practitioners and verify that graduates can execute independently
- [ ] Can design reinforcement mechanisms (incentive systems, performance metrics, organizational culture elements) that ensure long-term change sustainability
- [ ] Can develop and execute a transition management plan that minimizes organizational performance decline during large-scale transformation
- [ ] Can distinguish between formal and informal resistance in change initiatives and identify at least three cases where informal resistance pointed to actual design flaws

> Once you've achieved most of this checklist, you're ready to enter the Change Methodologist stage, where you'll develop your own change management methodology. According to CMI CMBoK Master-level competencies, the essence of this boundary is the transition from applying existing frameworks to creating new ones. Apply a "perform, get feedback, adjust" loop at the methodology level. Extract recurring patterns from 10 or more change cases you've managed, structure them, and seek peer expert feedback. That process is the starting point for developing your own framework.

---

## Level 6

#ChangeFramework #ChangeConferences #ChangeMaturityModel #ExpertDevelopment

### Summary

Codifying an industry-standard methodology and training new experts.

### Description

You move from applying existing methodologies to developing original ones that contribute to the industry. You extract patterns from dozens of experiences and codify a proprietary framework, validating it internally before sharing it at conferences and in professional media. You design a change maturity model for objectively evaluating organizational capability. You operate training curricula and certification systems that cultivate the next generation of professionals.

### Checklist

- [ ] Can codify a proprietary change management framework derived from practical experience and validate it within your own organization
- [ ] Can design a change maturity model that diagnoses organizational change capability across five or more stages
- [ ] Can present your methodology at industry conferences and receive peer expert review
- [ ] Can design and operate a change management professional development program of 40 or more hours
- [ ] Can demonstrate that 70% or more of program graduates can independently lead change initiatives
- [ ] Can contribute to industry discourse by publishing change management articles in professional media or academic journals
- [ ] Can recognize change management "success bias" (where only success stories are shared and failure causes are buried) and design a systematic methodology for analyzing failure cases

> Once you've achieved most of this checklist, you're ready to enter the Change Paradigm Maker stage, where you'll create new paradigms in change management. This transition means pioneering territory that existing frameworks from CMI, ACMP, and Prosci cannot capture. Just as Kotter (1995) demonstrated the limitations of existing change management practices through research and proposed a new model, the key transition signal is having your methodology independently adopted by three or more external organizations. Publishing through academic outlets or professional media subjects your methodology to peer review, validating its generalizability.

---

## Level 7

#ChangeParadigmLimits #CrossIndustryAdoption #ChangeTheory #ChangeMovementLegacy

### Summary

Creating new paradigms across industry, academia, and generations.

### Description

You identify limitations in existing change management paradigms and originate theories or frameworks that go beyond them. Your contributions span organizations and industries, influencing the field's evolution. Your work is cited in both academic research and practice, adopted across industries and cultures. The professionals you've cultivated operate as independent authorities. Evidence of this stage is your contributions being continuously referenced for five or more years.

### Checklist

- [ ] Can identify structural limitations in existing change management paradigms and originate a new theory or framework that overcomes them
- [ ] Can demonstrate that your framework has been independently adopted by three or more external organizations
- [ ] Can verify 10 or more citations in academic papers, professional books, or practice reports
- [ ] Can demonstrate that five or more change management professionals you've cultivated are operating as independent authorities
- [ ] Can demonstrate that your contributions have been continuously referenced for five or more years
- [ ] Can contribute to standard revisions or system development at professional change management bodies (CMI, ACMP, etc.)
- [ ] Can empirically demonstrate the limitations of assumptions underlying existing change management models (linear stage progression, resistance as something to overcome, etc.) and propose an alternative framework

> Once you've achieved most of this checklist, you're at the pinnacle of change management, making contributions that span theory and practice and endure across generations.

---

## References

- [CMI Change Manager Accreditation — Three Levels (Foundation, Specialist, Master)](https://change-management-institute.com/three-levels/) — Change Management Institute (CMI)
- [ACMP Standard for Change Management (5 Process Groups)](https://www.acmpglobal.org/page/the_standard) — Association of Change Management Professionals (ACMP)
- [Prosci ADKAR Model (Awareness, Desire, Knowledge, Ability, Reinforcement)](https://www.prosci.com/blog/prosci-certification-and-becoming-a-ccmp-) — Prosci Inc.
- [CMI Change Manager Competency Model](https://change-management-institute.com/accreditation/) — Change Management Institute (CMI)
- [Leading Change: Why Transformation Efforts Fail](https://hbr.org/1995/05/leading-change-why-transformation-efforts-fail-2) — Kotter, J. P. (1995). Harvard Business Review, 73(2), 59-67
